国内精品无码视频免费|久久九九国产无码高清|日韩免费码中文在线观看|在线亚洲午夜理论AV大片|a级毛片免费高清毛片视频|亚洲男人的天堂网在线观看|美女脱光光av免费一线网站|AV鲁丝一区鲁丝二区鲁丝三区

Welcome to zhongying water supply Hunan, China Website
Your Position: Home > Experts > Service Center

Operation manual for pipeline connection of frequency conversion water supply equipment

2017/2/28??????view:

Operation manual for pipeline connection of frequency conversion water supply equipment

 

One, win the negative pressure water supply equipment docking operation example
1, the equipment for the inlet and outlet flange, the municipal water inlet pipe and main pipe underground are also used to facilitate the flange, flange to flange connection.
2, water: non negative pressure water supply equipment inlet at non negative pressure steady flow tank, so in the docking, docking to the municipal network over the non negative pressure steady flow tank flange can be.
3, water: the main pipe flange butt joint equipment outlet flange can be.

 

 

Two, win the frequency constant pressure water supply equipment docking operation
1, the equipment into the water: stainless steel water tank or self built pool of water outlet flange butt frequency conversion constant pressure water supply equipment inlet flange.
2, equipment water: constant pressure equipment outlet flange butt cell pipeline blue method.

 

 

 

 

 

 

Name: *
tel: *
Question: *
leave your message
圖片看不清?點擊重新得到驗證碼